Gia Binh International Airport, Hanoi Capital Region - Vietnam

Prime Minister inspects Gia Binh International Airport construction

Credit: Masterise Aviation Infrastructure
Gia Binh International Airport, aerial concept render

Prime Minister Pham Minh Chinh visited the airport site and the Hanoi road link, calling for faster work without compromising quality, with key facilities due in time for APEC 2027.

Prime Minister Pham Minh Chinh inspected the construction of Gia Binh International Airport (GBIA – ICAO VVGB, IATA GBN) in Bac Ninh province on 7 March 2026, together with the resettlement area and the road linking the airport with Hanoi.

Progress at the time of the visit

  • The VIP terminal, taxiways, air traffic control tower and internal roads were all advancing.
  • More than 1,259 hectares had been cleared, nearly two-thirds of the required area.
  • The project covers about 1,885 hectares, with total investment of about VND 196.3 trillion (US$7.48 billion), including more than VND 141.2 trillion for phase one.

The Prime Minister’s directions

  • Speed up construction without compromising quality or technical standards.
  • Plan the surrounding area at the same time to build an aviation economy, including logistics and airport services.
  • Build a smart, modern aviation hub with an international-standard airport city.
  • Complete key facilities on schedule for APEC 2027, and develop the airport as a long-term growth driver for the region.

Road link to Hanoi

The road linking the airport with Hanoi is more than 41 km long, built to modern expressway standards with investment of about VND 83 trillion, and connects with the Hanoi – Lang Son and Hanoi – Thai Nguyen expressways and Hanoi’s Ring Road 3. It is due to open at the end of October 2027, putting the airport around 25 minutes from Hanoi.

Source: VietnamPlus, 7 March 2026.