EVA Air outlines 787-9 schedule in Nov 2018

EVA Air yesterday (08OCT18) opened reservation for its planned Boeing 787-9 aircraft, currently filed for the month of November 2018. The 787-9 is scheduled to operate Taipei Taoyuan – Hong Kong route, initially 2 daily, increasing to up to 4 daily.

Planned 787-9 operation as follows.

01NOV18 BR867/868, BR857/858
02NOV18 – 04NOV18 BR891/892, BR855/856
05NOV18 – 30NOV18 BR891/892, BR851/852, BR855/856, BR871/872

Configuration of the 787-9 is C26Y278, 787-10 is C34Y308.